Notes:
5/12/2025 1:55:20 PM
Contractor to confirm with inspector that no damage will/might be done to city right-of-way improvements for gas line lateral connection.
A valid C-8 or A licensed contractor will be required for the additional sidewalk work if damage to sidewalk occurs.
If necessary, Contractor to repair/replace any damaged sidewalk (Historic tile) due to gas lateral installation per City standard ST-5 or 5A and fix any trip hazards to the satisfaction of the city engineer. Sidewalk to be ADA compliant.
The applicant shall pay an additional fee for said sidewalk repair/replacement work.
This permit is for Right of Way Inspection only. It does not permit gas lateral or other gas connections.