Notes:
8/27/2025 2:11:22 PM
1 panel of sidewalk to be removed and replaced for electrical connection to transformer. Per City Standard ST-3. Pedestrian and other through traffic to be maintained at all times.
2 days of work. Remove sidewalk 1 day and replace the next.
WATCH Manual or MUTCD to be followed at all times.
Middle School Hours are to be avoided from 7:30 AM to 8:30 AM and 2:30 PM to 3:30 PM