Notes:
9/19/2025 3:14:29 PM
TRAFFIC CONTROL FOR DRILL RIGS FOR WELL PERMIT E25-0378.
DRILL RIGS TO BE SET UP ON E AVENIDA PICO AT CALLE DE LOS MOLINOS, AT THE CALLE DE LOS MOLINOS DRIVEWAY APPROACH TO PICO PLZA, AND ON CALLE DE INDUSTRIAS NEAR THE CHEVRON DRIVEWAY APPROACH.
TRAFFIC CONTROL MUST COMPLY WITH WATCH OR MUTCD MANUAL AT ALL TIMES. ANY WORK/TRAFFIC CONTROL THAT IMPACTS A SIGNALIZED INTERSECTION MUST BE COORDINATED WITH JUAN GILDEA, ELECTRICAL COORDINATOR (949)361-8347 THROUGH THE PUBLIC WORKS INSPECTOR.