Notes:
4/14/2026 4:34:45 PM
INSTALL GAS SERVICE - (1) 3'X3' ASPHALT CUT
TG: 992-G4 NOT# 33867026
USA all utilities in construction/boring area. Protect in place existing city infrastructure.
Trenching per city standard WS-1.
MUTCD or WATCH Manual to be followed at all times.
**CONTRACTOR TO CONFIRM WITH CITY INSPECTOR PRIOR TO CONSTRUCTION IF STREET HAS ALREADY BEEN SLURRIED. IF SO, A NEW PERMIT WILL BE REQUIRED.**