Notes:
5/21/2025 10:36:07 AM
Contractor to construct new minimum 4 foot wide concrete sidewalk where missing per City Standard ST-3 under separate Engineering Department encroachment permit.”
This should be shown on the site plan and fill in the area around the existing power
pole. The mailbox should be relocated out of the right of way.
5/22/2025 7:57:50 AM
Double D Concrete Construction - SL 754635