Notes:
12/3/2025 2:03:13 PM
Proj ADF-MAG-SCLE-UG1 (ADF-2504SA-U1): Install ~227 LF of new conduit for future fiber optic cable.
Avd Santa Margarita:
Approx 100 LF of open trench in sidewalk (100 SF R&R per ST-3)
Approx 93 LF of directional boring (1 AC BP ~25 SF R&R per WS-1)
S El Camino Real:
Approx 28 LF of open trench sidewalk (270 SF R&R per ST-3)
Approx. 74 LF of directional boring (2 AC BPs ~50 SF R&R per WS-1), 2 - 3' x 3' PH's (~18 SF AC R&R per WS-1)
Traffic control must comply with WATCH or MUTCD manual at all times.