Notes:
3/12/2026 6:51:00 AM
AT&T_PROJECT A059NJF-B
TRENCH AND BORE APPROXIMATELY 2080 LF OF NEW CONDUIT:
L-1: FROM 106 TO 129 AVD. SIERRA.
L-2 & L-3: FROM 124 TO 160 CALLE REDONDEL.
L-4: FROM 210 TO 217 CALLE DE LOS MOLINOS.
L-5: FROM 208 CALLE DE LOS MOLINOS TO 107 CALLE BONITO.
L-6: 401 E AVD PICO THRU MOLINOS INTERSECTION TO 400 E AVD PICO.
STREET ASPHALT EXCAVATION/BACKFILL RESTORATION PER CITY STD WS-1. PUBLIC CONCRETE REPLACEMENT PER ST-3, ALL RESTORATIONS TO BE DONE TO THE SATISFACTION OF THE CITY ENGINEER. ALL TRAFFIC CONTROL MUST COMPLY WITH WATCH OR MUTCD MANUAL AT ALL TIMES. PRELIMINARY TCP ATTACHED.