Notes:
1/27/2026 11:29:18 AM
COX_PRJ310680
DIRECTIONAL BORE 397' OF 2 NEW 2" CONDUITS ALONG THE WEST SIDE OF CALLE DE LOS CAMINO APPROX. 3' OFF OF CURB FACE. EXACT LOCATION TO BE DETERMINED IN THE FIELD AFTER USA MARK-OUT. ALIGNMENT SUBJECT TO CHANGE BY THE CITY ENGINEERING INSPECTOR TO MEET REQUIRED OFF-SETS FROM EXISTING CITY UTILITIES.
TRAFFIC CONTROL MUST COMPLY WITH WATCH OR MUTCD MANUAL AT ALL TIMES. STREET ASPHALT TRENCH RESTORATION PER WS-1. SIDEWALK CONCRETE REPLACEMENT PER ST-3.
<>