Notes:
Traffic control for Cal Trans and SDGE work. Project scope includes city lighting under the bridge: soffit lights and three freeway lights on I-5 NB. A new metered pedestal will be installed by SDGE. Conduit to be installed by directional boring. All existing utilities (services and mains) must be identified and their locations confirmed through visual inspection (pothole verification). Proper separation of 36" must be maintained for wet utilities and 60" for gas line. Sewer laterals are privately owned in the City of San Clemente and are not identified in underground service alerts, therefore it's the responsibility of the contractor to identify and protect them during work activities within the street right-of-way. A pre-con meeting is required. A SoCal Gas representative must be present at the meeting. Traffic control per WATCH/MUTCD at all times. One lane in each direction must be open at all times; no full street closure. Working hours 9am-3:30pm only. No fee permit.
Cal Trans/SDGE