Notes:
Potholing for SCWD Isolation Valve Project on Presidio & N L
3/6/2023 11:11:42 AM
N LA ESPERANZA UNDER MORATORIUM UNTIL 2025. Special repaving requirements will apply due to moratorium and by inspectors discretion. Contractor to pothole 8 locations total for SCWD Isolation Valve Project: Four (4) on Avd Presidio and four (4) on N La Esperanza.. See attached exhibit for specific locations.
STREET REPAIR PER CITY STD. DWG WS-1 AND BY CITY INSPECTORS DIRECTION. TRAFFIC CONTROL MUST COMPLY WITH WATCH OR MUTCD MANUAL AT ALL TIMES. CONTRACTOR REQUIRED TO COORDINATE WORK WITH "OUR LADY OF FATIMA" SCHOOL @ 105 S. LA ESPERANZA. NOTE POTHOLE #1 AQPPEARS TO BE ON PRIVATE PROPERTY (EASEMENT), CONTRACTOR RESPONSIBLE FOR COORDINATING DRIVEWAY DISRUPTION WITH PRESIDIO POINT CONDOMINIUMS.