Notes:
5/30/2024 10:01:09 AM
All street trenching under this permit is on Calle La Quinta, an HOA owned and maintained street. Contractor required to keep HOA informed. Any electrical work requires a separate electrical building permit.
SCOPE: Contractor to trench approx. 486' for new 2' electrical conduit. NOTE: City water, sewer and storm drain are located in this private street. City utilities to be protected at all times. Electrical conduit must maintain 3' of horizontal separation. See attached record drawing of public utilities for approx. locations. City inspector to determine required minimum off-set.
Traffic control must comply with WATCH or MUTCD manual at all times.