Notes:
Contractor to reconstruct drive approach per City Standard ST-9. Contractor (or City) to abandon the existing water meter at the main and construct new water meter where shown on Site plan per City Standard WS-1 out side of drive approach.
(7/5/2018 9:34 AM ENGR)
Need $500 deposit for paving work. Class A or C-34 contractor to return to put down deposit and pull permit.
(10/27/2020 9:02 AM ESH)
Previous permit fee applied to sidewalk work. Water meter relocation to be performed by City crews and billed separately.
New drive approach and water meter