Notes:
e21-0067Trenching new electrical conduit across public alley
11/5/2020 12:00:00 AM
Contractor to trench new electrical conduit across public alley to connect building to new generator in the parking lot. The alley has 2 water mains (6" & 14"), an 8" sewer main, and potentially a 12" gas main longitudinally that they will be crossing with the new electrical conduit.
Pavement restoration per City standard WS-1. Traffic control must comply with WATCH or MUTCD manual at all times.