Notes:
10/11/2023 3:32:50 PM
Contractor to reconstruct sidewalk along the frontage per City standard ST-3 with 4 foot width, maximum @% cross fall as noted on building plans/permit B23-1986. Existing sidewalk is less than 4 feet wide. Curb to property line is 7 feet.