Notes:
10/21/2025 2:35:24 PM
Contractor to reconstruct corner access ramp per City Standard ST-2 with truncated dome utilizing tile sidewalk per ST-5 or 5A.
Any damaged sidewalk along frontage shall be replaced with tile per ST-5/5A.
WATCH Manual or MUTCD to be followed at all times.