Permit Info
Short Description:
New separate water meter & service for ADU
Notes:
3/17/2025 5:32:22 PM
D.4.b. Utility Fees
i. If an ADU is constructed with a new single-family home, a separate utility connection directly between the ADU and the utility and payment of the normal connection fee and capacity charge for a new dwelling are required.
ii. Except as described in Subsection D.4.b.i, converted ADUs on a single-family lot that are created under Subsection D.1.a above are not required to have a new or separate utility connection directly between the ADU and the utility. Nor is a connection fee or capacity charge required.
iii. Except as described in Subsection D.4.b.i, all ADUs that are not covered by Subsection D.4.b.ii require a new, separate utility connection directly between the ADU and the utility.
Parcel Info
City/State/Zip:
SAN CLEMENTE, CA, 92672-3714
|
| ENG ENCROACHMENT PERMIT |
$629.00
|
|
| Total Fees |
|
Charged: $629.00
Balance Due: $629.00
|
There are currently no inspections on this record.
|
| ENGR 1ST | RON NICHOLAS | PC Approved | 3/17/2025 | 3/17/2025 | 4/8/2025 |
More Info
|